Hi everyone,

how are you?

Just so that you know both lanes of Coldharbour Lane will be closed on Sunday 26 April 2015 from 7 am-2 pm.

Last November a tipper lorry came into contact with the Port of London Authority’s pipe bridge over Coldharbour Lane causing structural damage.  The damaged section of bridge was removed, has now been repaired, and is ready to be lifted back into position. In order to achieve this Coldharbour Lane will be closed on Sunday 26 April 2015.

Both lanes of the road will be closed to lift the bridge into position. There will be no access past the security hut (on Coldharbour Lane) in or out of the Veolia/Freightmaster Estate during this time.